| Operator | |
| Company | |
| Model | |
| Shift | |
| Date | |
| Hourmeter |
| Visual Checks | |
| 01. Load charts and symbols |
|
| 02. Hydraulic fluid level |
|
| 03. Slewing oil level |
|
| 04. All mounting bolts | |
| 05. Leaks around the hydraulic system | |
| 06. Inspect boom sections for cracks or dents | |
| 07. Winch and wire rope, if applicable | |
| 08. Load hook for stretch, wear, safety latch in place | |
| Operational Checks | |
| 01. Ensure the control levers are centering with the PTO disengaged |
|
| 02. Check the remote control system, if applicable |
|
| 03. Latches and locks on outrigger beams |
|
| 04. All mounting bolts | |
| 05. Engage the PTO, check operation and for fluid leaks | |
Reported to supervisor?
Yes
No
List any problems: ![]() |
CAUTION: This may not be a complete list of the items that require attention. Operators are responsible for ensuring that the HIAB Crane is in proper working condition in accordance with the manufacturers specifications.
|